Between-Joist UFH
Most older Kent homes sit on a suspended timber floor: joists spanning a void, boarding on top, insulation (if any) between. When you can't raise the finished floor level because of doors, stairs or skirtings, a between-joist system is the right answer. The pipe lives inside the floor zone, not on top of it, so nothing at the room level changes.
The method is careful. We lift the existing boards, fit a continuous insulation layer 25mm below the tops of the joists, clip the pipe onto the insulation and route it properly back to a manifold, then fill the space above the pipe with a dry screed so the pipe sits flush with the top of the joists. The floor covering then sits directly on the dry screed with proper contact, so the heat transfers into the room cleanly.
Output from a suspended-floor system is a little lower than a full in-screed because there's less thermal mass, but response time is faster, which suits how most homes actually heat. Zoned properly with modern controls, it's responsive, quiet, and comfortable. We talk through the finish you're planning so the right insulation thickness and dry-screed combination is specified up front.
Pricing is bespoke per job because every suspended floor has its own quirks. We'll survey, scope the work, and give you a fixed quote before anything is lifted. Free quotations, no pressure, and proper attention to putting the floor back the way you want it finished.